Sproul Pt. Sal survey

Since the first Intensive Operations Period (IOP 1) in September/2017, results from the different groups have been coming together to reveal a complicated plot around Pt. Sal, with lots of topographic wakes, recirculation south of the point, ridiculously sharp fronts and some really aggressive high-frequency internal waves. Between about noon on the 12th until 9 am on the 13th, we … Read More